Home/Ealing/Front Garden Paving planning permission
Ealing · Front Garden Paving · 2026

Front Garden Paving Planning Permission in Ealing: 2026 Guide

Ealing has significant conservation area coverage at 19%, and several streets are covered by design guidance that affects front garden paving applications. Householder approvals in Ealing run at around 76% with an average decision time of 10 weeks.

Verdict
May be permitted development

A front garden paving in Ealing can often be permitted development when it stays within size and design limits and no local constraint applies to your address. Always confirm at address level.

Planning Constraints in Ealing for Front Garden Paving

Conservation area coverage
19%
Approval rate (Ealing)
76%
Avg. decision time
10 weeks
Article 4 directions
1
Numerous Victorian and Edwardian conservation areas
Borough-wide HMO Article 4
Key views and tall buildings policy around town centres
Article 4 directions in Ealing
  • HMO Article 4 across the borough

Permitted Development Rules

Paving the front garden is permitted development provided the hardstanding uses permeable materials, OR if the non-permeable area is under 5m².

  • Permeable paving (gravel, permeable block, permeable concrete) is PD at any size.
  • Non-permeable paving is PD only up to 5m² total.
  • Runoff must not flow onto the public highway.
  • Listed buildings and some conservation areas restrict hard surfacing.
  • Front garden trees with TPOs must be protected during works.

Read the full front garden paving planning guide for the national rules and application process.

Recent Front Garden Paving Decisions in Ealing

The CanUBuild checker surfaces real recent applications close to your address — approvals and refusals — so you can see what the planning officers at Ealing Council have approved for comparable schemes. Nearby precedent is one of the strongest signals for your own chances.

Frequently Asked Questions

Do I need planning permission for a front garden paving in Ealing?

In Ealing, the answer depends on whether your property sits in a conservation area (19% of the borough), is listed, or falls within an Article 4 direction. Most front garden paving proposals are permitted development for houses when they stay within GPDO limits and no local constraint applies. Check your exact address with the CanUBuild checker before spending on drawings.

Can I build a front garden paving in a conservation area in Ealing?

Conservation areas in Ealing typically remove several permitted development freedoms. For a front garden paving, the Larger Home Extension route and some external alterations do not apply, so a full householder application is usually required. Planning officers at Ealing Council assess conservation area proposals against the specific character appraisal for the street.

How long does a front garden paving application take to decide in Ealing?

Ealing Council currently averages around 10 weeks for householder applications. Complex front garden paving proposals — particularly those in conservation areas or on listed buildings — can take longer. Prior approval decisions for Larger Home Extensions are typically issued in 42 days.

Next step

Check your specific address in Ealing

Address-level constraints and recent decisions around the corner. No drawings needed.