Home/Croydon/Dropped Kerb planning permission
Croydon · Dropped Kerb · 2026

Dropped Kerb Planning Permission in Croydon: 2026 Guide

Croydon has relatively low conservation area coverage at 8%, so most streets remain eligible for permitted development when the design stays within national limits. Householder approvals in Croydon run at around 75% with an average decision time of 11 weeks.

Verdict
Likely needs planning permission

A dropped kerb in Croydon is likely to need a full householder application because local constraints commonly remove the permitted development route. Verify with an address-level check before you commission drawings.

Planning Constraints in Croydon for Dropped Kerb

Conservation area coverage
8%
Approval rate (Croydon)
75%
Avg. decision time
11 weeks
Article 4 directions
2
Suburban Design Guide applies to most householder cases
TPOs common in established suburbs
Tall buildings sensitive around Croydon Metropolitan Centre
Article 4 directions in Croydon
  • HMO Article 4 in specified wards
  • Office-to-residential Article 4 in central Croydon

Permitted Development Rules

Dropped kerbs are not covered by permitted development rights. They require a crossover/vehicle crossing application to the highways authority and, if the front garden exceeds 5m², a paving planning application alongside.

  • Vehicle crossover application required to the borough highways team.
  • If the front garden is paved and exceeds 5m², a planning application for the hardstanding is also required (unless permeable materials are used).
  • Sightlines from the driveway must meet the council's highways standards.
  • Trees on the highway cannot be removed to create the crossover in most boroughs.
  • Most boroughs require the applicant to pay for the crossover construction.

Read the full dropped kerb planning guide for the national rules and application process.

Recent Dropped Kerb Decisions in Croydon

The CanUBuild checker surfaces real recent applications close to your address — approvals and refusals — so you can see what the planning officers at Croydon Council have approved for comparable schemes. Nearby precedent is one of the strongest signals for your own chances.

Frequently Asked Questions

Do I need planning permission for a dropped kerb in Croydon?

In Croydon, the answer depends on whether your property sits in a conservation area (8% of the borough), is listed, or falls within an Article 4 direction. A dropped kerb is not covered by permitted development and normally requires its own consent process. Check your exact address with the CanUBuild checker before spending on drawings.

Can I build a dropped kerb in a conservation area in Croydon?

Conservation areas in Croydon typically remove several permitted development freedoms. For a dropped kerb, the Larger Home Extension route and some external alterations do not apply, so a full householder application is usually required. Planning officers at Croydon Council assess conservation area proposals against the specific character appraisal for the street.

How long does a dropped kerb application take to decide in Croydon?

Croydon Council currently averages around 11 weeks for householder applications. Complex dropped kerb proposals — particularly those in conservation areas or on listed buildings — can take longer. Prior approval decisions for Larger Home Extensions are typically issued in 42 days.

Next step

Check your specific address in Croydon

Address-level constraints and recent decisions around the corner. No drawings needed.