Dropped Kerb Planning Permission in Barnet: 2026 Guide

Barnet has relatively low conservation area coverage at 12%, so most streets remain eligible for permitted development when the design stays within national limits. Householder approvals in Barnet run at around 78% with an average decision time of 10 weeks.

Verdict
Likely needs planning permission

A dropped kerb in Barnet is likely to need a full householder application because local constraints commonly remove the permitted development route. Verify with an address-level check before you commission drawings.

Planning Constraints in Barnet for Dropped Kerb

Conservation area coverage
12%
Approval rate (Barnet)
78%
Avg. decision time
10 weeks
Article 4 directions
1
Large suburban character areas
Green Belt covers around a quarter of the borough
Tree Preservation Orders common on established streets
Article 4 directions in Barnet
  • HMO Article 4 across the borough

Permitted Development Rules

Dropped kerbs are not covered by permitted development rights. They require a crossover/vehicle crossing application to the highways authority and, if the front garden exceeds 5m², a paving planning application alongside.

  • Vehicle crossover application required to the borough highways team.
  • If the front garden is paved and exceeds 5m², a planning application for the hardstanding is also required (unless permeable materials are used).
  • Sightlines from the driveway must meet the council's highways standards.
  • Trees on the highway cannot be removed to create the crossover in most boroughs.
  • Most boroughs require the applicant to pay for the crossover construction.

Read the full dropped kerb planning guide for the national rules and application process.

Recent Dropped Kerb Decisions in Barnet

The CanUBuild checker surfaces real recent applications close to your address — approvals and refusals — so you can see what the planning officers at Barnet Council have approved for comparable schemes. Nearby precedent is one of the strongest signals for your own chances.

Frequently Asked Questions

Do I need planning permission for a dropped kerb in Barnet?

In Barnet, the answer depends on whether your property sits in a conservation area (12% of the borough), is listed, or falls within an Article 4 direction. A dropped kerb is not covered by permitted development and normally requires its own consent process. Check your exact address with the CanUBuild checker before spending on drawings.

Can I build a dropped kerb in a conservation area in Barnet?

Conservation areas in Barnet typically remove several permitted development freedoms. For a dropped kerb, the Larger Home Extension route and some external alterations do not apply, so a full householder application is usually required. Planning officers at Barnet Council assess conservation area proposals against the specific character appraisal for the street.

How long does a dropped kerb application take to decide in Barnet?

Barnet Council currently averages around 10 weeks for householder applications. Complex dropped kerb proposals — particularly those in conservation areas or on listed buildings — can take longer. Prior approval decisions for Larger Home Extensions are typically issued in 42 days.